GALLERY
 |
 |
 |
|
Gas well Dewatering
Installation on a newly drilled well.
|
|
|
Heavy Oil Production
Continuous Pump-To-Surface system pumping the entire tubing string with no sucker rods.
|
|
|
Light Crude Production
High volume light crude production on a re-opened well.
|
|
 |
 |
 |
|
High Volume Production
The ICI intensifier skid running a GR-20 at 9+ strokes per minute at a 120" stroke and 2" downhole pump.
|
|
|
International Delivery
Installation of the GR-20-86 in Australia for dewatering gas wells.
|
|
|
Remote Locations
Installation on a remote gas well that can only be accessed once a year (as evident by the 12 propane tanks)
|
|
 |
 |
 |
|
Pad Wells
Installation on a series of oil wells drilled in close proximity.
|
|
|
Shallow Gas Production
Installation of the Copperhead hydraulic jack for a shallow dewatering project.
|
|
|
Electrified Fields
Installation on 3 wells in a row in an electrified field with long term potential.
|
|
 |
 |
 |
|
Wellsite Service
ICI saves costs by shipping and installing the surface equipment with only a 2-tonne picker truck.
|
|
|
Slant Well Installation
Since ICI's pumpjacks bolt directly to the wellhead, they can be easily installed on slant/deviated wells.
|
|
|
Service Rig Installations
Service rig crew installs ICI's coilable wellhead on a high sand/high debris content well.
|
|
 |
 |
 |
|
Service Rig Installation
Service rig crew sets the downhole anchor in a Continuous Pump-to-Surface application
|
|
|
Service Rig Installation
Service rig lifts the pumpjack into position.
|
|
|
Service Rig Installation
Service rig crew installs pumpjack.
|
|
 |
 |
 |
|
Service Rig Installation
ICI technician gets the well pumping prior to the service rig leaving location.
|
|
|
Low Cost Installation
This installation is completed with a low cost 1- tonne picker truck.
|
|
|
Light Oil Production
The Golden Rod 20 Series powered by an electric prime mover on a light crude application.
|
|